CCCC Fourth Harbor wins contract for dredging project in Haitang Bay
CCCC Fourth Harbor Engineering Co., Ltd. has recently won the EPC contract for the water works of Haitang Bay in Sanya, with a contract value of 1.36 billion yuan and a construction period of 2 years.
Located at Haitang Bay National Coastal Tourism Development Zone, the project is divided into south, central and north sections according to the preliminary design, and involves dredging, excavation and revetment construction of a main river and three branch rivers as well as construction of two pumps and sluices.
With a full length of some 13,650 meters, a length of 60 meter in the narrowest section and a length of 120 meters in the widest part, the main river can accommodate large yachts and ships.
After its completion, the project will become a major landscape ecology project in Sanya Haitang Bay International Leisure Resort and further improve the tourist reception capacity and service level of Haitang Bay Development Zone.
SOURCE: dredgingtoday.com
Editorial Message
This site contains materials from other clearly stated media sources for the purpose of discussion stimulation and content enrichment among our members only.
whatsonsanya.com does not necessarily endorse their views or the accuracy of their content. For copyright infringement issues please contact editor@whatsonsanya.com
whatsonsanya.com does not necessarily endorse their views or the accuracy of their content. For copyright infringement issues please contact editor@whatsonsanya.com